This report provides a summary of partial synchronizations from
the PDC to the BDC during the time specified. The report includes
the partial synchronization events (5715) from the System event log
with the NetLogon source. The report is sorted by PDC
Name, as well as by the BDC Name and Date.
The columns of this report are defined as follows:
PDC Name
Specifies the name of the PDC that made the
synchronization.
BDC Name
Specifies the name of the BDC to which the PDC identified in
the PDC columns synchronized.
Date
Specifies the date and time the synchronization took
place.
Replicated Database
Specifies the name of the database replicated.
Number of Objects
Specifies the number of objects included in the
synchronization.